Emergency Contingency Procedures ECP - Matrix Hull Leak |
Doc No.: ECP-A17 Revision: 01 Date: 15 Oct 2024 Issued by: DPA Approved by: MD |
.
Note:
- Hardcopy to be maintained on bridge.
| Action to be taken | Bridge Team | Technical Team | Emergency Squad | Watch Officer | Office |
|---|---|---|---|---|---|
| Secure isolation valves | ⚫ | ||||
| Secure pumping (if applicable) | ⚫ | ||||
| Alert crew and commence notifications | ⚫ | ⚫ | |||
| If vessel is unable to manoeuvre due to exceptional circumstances, display ‘Not under command’ signal (as per COLREGS Rule 27). Change the navigation status on the AIS | ⚫ | ⚫ | |||
| Implement VRP/ SOPEP as applicable | ⚫ | ⚫ | |||
| Implement oil spill removal and verify containment | ⚫ | ||||
| Determine location and survey extent of casualty | ⚫ | ||||
| Determine rate flow loss, structural stability & stress conditions | ⚫ | ⚫ | |||
| Implement stability and salvage plans | ⚫ | ⚫ | ⚫ | ⚫ | |
| Report casualty to owners, P&I etc. | ⚫ | ⚫ | |||
| Coordinate shore-side response | ⚫ | ⚫ | |||
| Ascertain cause of casualty | ⚫ | ⚫ | ⚫ | ||
| Determine corrective action | ⚫ | ⚫ | ⚫ | ||
| Preserve VDR / SVDR records if not automatically protected | ⚫ |