Emergency Contingency Procedures
ECP - Matrix
Bridge Control Telegraph Failure
Doc No.: ECP-A27
Revision: 01
Date: 15 Oct 2024
Issued by: DPA
Approved by: MD

.

Note:


Action to be taken Bridge Team Technical Team Emergency Squad Watch Officer Office
Notify Office
Master Informed
Chief Engineer Notified
Emergency communications established with Engine Room
Change over ME control from bridge to Engine Control Room (ECR)
Change over ME control from ECR to local control station if main engine is not responding from ECR.
Preserve VDR or S-VDR records if not automatically protected
Ascertain cause of casualty
Report casualty
Provide support as needed