|
Emergency Contingency Procedures ECP - Matrix Electrical Power Failure |
Doc No.: ECP-A30 Revision: 01 Date: 15 Oct 2024 Issued by: DPA Approved by: MD |
.
Note:
- Hardcopy to be maintained on bridge.
| Action to be taken | Bridge Team | Technical Team | Emergency Squad | Watch Officer | Office |
|---|---|---|---|---|---|
| Report Casualty | ⚫ | ⚫ | |||
| Alert vessel’s crew | ⚫ | ||||
| Implement VRP / SOPEP / SMPEP as applicable | ⚫ | ⚫ | |||
| Verify vessel’s position | ⚫ | ||||
| Alert other vessel in the area | ⚫ | ||||
| Establish and maintain communications with appropriate maritime government agency | ⚫ | ||||
| Determine if ship’s crew is capable to repair source of casualty | ⚫ | ⚫ | |||
| Determine the estimated time of repair completion | ⚫ | ⚫ | |||
| While running the emergency generator a continuous watch should be maintained, for closely monitoring the performance parameters and the general condition. | ⚫ | ⚫ | |||
| Determine need for commercial salvage assistance | ⚫ | ⚫ | |||
| Prepare ship’s personnel to initiate oil spill mitigation and removal action as warranted | ⚫ | ||||
| Determine cause of casualty | ⚫ | ||||
| Preserve VDR or S-VDR records if not automatically protected | ⚫ | ||||
| DOTCOM laptop on bridge | ⚫ | ⚫ | |||
| Call master | ⚫ | ||||
| Take immediate action to keep ship away from danger | ⚫ | ||||
| Contact E/R, duty Engineer | ⚫ | ||||
| Select emergency power supplies for bridge and navigational equipment | ⚫ | ||||
| Check for navigational hazards | ⚫ | ||||
| Not Under Command (NUC) lights, shapes and sound signals as appropriate, modify AIS status | ⚫ | ||||
| Prepare for anchoring if water depth and condition appropriate | ⚫ | ⚫ | |||
| Maintain log of events and decision | ⚫ |