Emergency Contingency Procedures
ECP - Matrix
Electrical Power Failure
Doc No.: ECP-A30
Revision: 01
Date: 15 Oct 2024
Issued by: DPA
Approved by: MD

.

Note:


Action to be taken Bridge Team Technical Team Emergency Squad Watch Officer Office
Report Casualty
Alert vessel’s crew
Implement VRP / SOPEP / SMPEP as applicable
Verify vessel’s position
Alert other vessel in the area
Establish and maintain communications with appropriate maritime government agency
Determine if ship’s crew is capable to repair source of casualty
Determine the estimated time of repair completion
While running the emergency generator a continuous watch should be maintained, for closely monitoring the performance parameters and the general condition.
Determine need for commercial salvage assistance
Prepare ship’s personnel to initiate oil spill mitigation and removal action as warranted
Determine cause of casualty
Preserve VDR or S-VDR records if not automatically protected
DOTCOM laptop on bridge
Call master
Take immediate action to keep ship away from danger
Contact E/R, duty Engineer
Select emergency power supplies for bridge and navigational equipment
Check for navigational hazards
Not Under Command (NUC) lights, shapes and sound signals as appropriate, modify AIS status
Prepare for anchoring if water depth and condition appropriate
Maintain log of events and decision