Emergency Contingency Procedures ECP - Matrix Containment Failure |
Doc No.: ECP-A5 Revision: 01 Date: 15 Oct 2024 Issued by: DPA Approved by: MD |
.
Note:
- Hardcopy to be maintained on bridge.
| Action to be taken | Bridge Team | Technical Team | Emergency Squad | Watch Officer | Office |
|---|---|---|---|---|---|
| Sound general alarm | ⚫ | ⚫ | |||
| If in port - advise terminal | ⚫ | ⚫ | |||
| Stop cargo operations - activate emergency shut down | ⚫ | ⚫ | ⚫ | ||
| Isolate all cargo tanks / lines | ⚫ | ⚫ | ⚫ | ||
| Isolate non-essential equipment | ⚫ | ⚫ | |||
| Assure accommodation ventilation is in full recirculation | ⚫ | ⚫ | |||
| Muster crew - conduct tally of personnel. Ensure staff provide emergency gear | ⚫ | ⚫ | ⚫ | ||
| Prohibit all smoking | ⚫ | ⚫ | ⚫ | ⚫ | |
| Eliminate all sources of ignition in area | ⚫ | ⚫ | ⚫ | ||
| Maintain accommodation and engine room gas free | ⚫ | ⚫ | ⚫ | ||
| Assess and monitor extent of leakage | ⚫ | ||||
| Advise management and charterers | ⚫ | ||||
| If at sea - advise nearest port state and alert vessel in vicinity | ⚫ | ||||
| If vessel is unable to manoeuvre due to exceptional circumstances, display ‘Not under command’ signal (as per COLREGS Rule 27). Change the navigation status on the AIS | ⚫ | ⚫ | |||
| Purge space continuously with inert gas (if fitted) or allow void space to vent | ⚫ | ⚫ | |||
| Disperse gas cloud with water spray | ⚫ | ⚫ | ⚫ | ||
| Consider deballasting double bottom or circulating ballast water, if liable to freezing | ⚫ | ⚫ | |||
| Consider transfer of cargo | ⚫ | ⚫ | |||
| Implement VRP/SOPEP/SMPEP | ⚫ | ⚫ | ⚫ | ||
| Preserve VDR / SVDR records if not automatically protected | ⚫ |