OTM-7.19 Oil Tanker Manual
OTM
Ship to Ship Transfer
Doc No.: OTM 7.19
Revision: 01
Date: 15 Oct 2024
Issued by: DPA
Approved by: MD

1. APPLICATION

This document applies to the Master and Deck Officers onboard fully managed tank vessels.

2. PURPOSE

To specify standard requirements for ship-to-ship transfer operation. Under the scope of this procedure, bunkering / de-slopping operations are not considered as STS operations.

Note:

3. REQUIREMENT

Carriage of STS operation plan written in the working language of the ship is mandatory for oil tankers engaged in STS operation under the following regulations:

Note:

4. RESPONSIBILITIES

Master:


Note:

Coution:


Chief officer

Deck officers

Mooring master / POAC

Marine Superintendent


Note:

5. DEFINITION

6. GENERAL

6.1 Notification

Any oil tanker that plans STS operations within the territorial sea or the EEZ of a party to MARPOL, shall notify the relevant coastal state party not less than 48 hours in advance of the scheduled STS operations. The notification shall include at least the following:


Note:

6.2 Ship-to-Ship Communication


Note:

6.3 Lightering Rendezvous Locations

6.4 Anchoring during STS Operations

6.5 Transshipment of Cargo with Barges in Port Limits / Double Banking at Berth

6.6 Electrical Safety

Note:

6.7 Helicopter Operations

6.8 Work / Rest Hours and Fatigue


Note:

6.9 Personnel Transfer

6.10 Safety Drills

Master and ship’s crew should prepare to mitigate emergencies by conducting drills/training prior to conducting STS operations.

6.11 Weather Operating Conditions

The vessel shall obtain weather reports in advance and ascertain if the weather would remain favorable for the planned period of STS operation. Weather should be monitored by all available means.

6.12 Maximum Operating Conditions

6.13 Navigational Warnings

6.14 Lights and Shapes

6.15 Fenders and Rigging


Note:

6.16 Cargo Transfer Hoses

7 STAGES OF OPERATION


Note:

Stage 1 - Prior Arrival

Stage 2 - Arrival

Stage 3 - Approach and Mooring


Coution:


Double Banking


Note:


Stage 4 - Cargo Transfer

Stage 5 - Unmooring


Note:


For personal transfer, refer to STS Form 01F - STS personal transfer by crane. For vapour balancing, refer to STS Form 01G - STS involving vapour balancing.

Stage 6 - Review of STS Operation by Master

8 REFERENCED FORMS AND CHECKLISTS